Truck/Rail/Ship Loading and Unloading
Getting materials onto and off of trucks and rail cars and barges takes a lot of equipment and even more insight. Coal, limestone, coke, gypsum and fertilizer each need special handling.
Wolf Point’s engineers have been designing and building loaders, unloaders, dumpers and dust hoods since the 1970s. Their projects stretch from Alberta to Jakarta.
Contact us to learn more about Wolf Point’s work with mines, ports and power plants.
The truck loading system at ORASCOM’s urea fertilizer plant in Wever, Iowa, can load two trucks simultaneously.
The Zimmer Plant, in Moscow, Ohio, was a turnkey contract for engineering, procurement, construction, start-up and commissioning of a gypsum handling and barge loading system. It features a moveable-loading chute with a telescoping spout designed to fill covered barges through open hatches.